Current Projects

Town Hall Campus:

Th campus cp1 1

From February 2015, we embarked on the planning and design off adding an additional 15 new classrooms, a library, a kitchen and a sports hall.

Th campus cp2 Th campus cp3

Britwell Campus:

Bw campus cp1

KS 2 Roof- New roof installed, this is using the Pantile 2000 system, which is easier to maintain, and will last longer than the old tiling method.

Over the Easter Break 2017, we will be carrying out an installation of a Specialist 24mm depth Multi Use Games Area Artificial Grass surfacing laid to provide an all-weather surface.

Bw campus cp2