Future Projects

Britwell Campus:

 A project is being developed in two stages; 

1) Lobby area – a glass fronted lobby area to provide a light, airy and welcoming front entrance to incorporate seating areas, two meeting pods and a re-designed reception/meet & greet point.

 2) Lobby area – as above together with a linked glass fronted atrium to the existing hall to provide changing rooms and gym space.

Learning env1